Connection of large PV power plants to the transmission grid
March 2019 - October 2019
Funding entity Iberenova Promociones S.A.U
The objective of the project is to evaluate the connection of large PV plants to the Spanish transmission grid. Power flow and short circuito analysis are performed.
Research topics:
- *Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks